Shipped in 2025
1,336.0PJ
Cargo energy at Curtis Island
Shipped in 2025
1,336.0PJ
Cargo energy at Curtis Island
A fifth of those cargoes
267.2PJ
The cap, applied to 2025 exports
Gas the plants took, 2025
1,423.1PJ
Bulletin board. Matches AEMO's LNG line
2028 cap against home use
271.9PJ
Home and business use plus 10% is larger, so the cap binds
Exact values, feed gas in 2025. APLNG 565.7 PJ. QCLNG 495.0 PJ. GLNG 362.5 PJ. Published plant sizes: APLNG 9.5 Mt a year, QCLNG 8.5, GLNG 7.8.
Exact values. 2024 cargoes 1,376.7 PJ, feed gas 1,439.0 PJ. 2025 cargoes 1,336.0 PJ, feed gas 1,423.1 PJ. 2026 cargoes so far 990.9 PJ through 30 September 2026. 2026 feed gas so far 1,269.2 PJ over 322 days.
A fifth of 2025 cargoes is 267.2 PJ. The southern annual gap in the middle outlook is 1.3 PJ in 2029 and 12.2 PJ in 2030. Using that year's own LNG outlook, the fifth left over after the annual gap is 281.6 PJ in 2029 and 256.5 PJ in 2030. In 2028, home and business use plus 10% is 412.3 PJ and a fifth of outlook LNG is 271.9 PJ, so the obligation is the cap. The annual gap that year is zero. The reserved gas is much larger than the annual gap and smaller than a full year of home and business use.