East-coast gas

Shipped in 2025

1,336.0PJ

Cargo energy at Curtis Island

A fifth of those cargoes

267.2PJ

The cap, applied to 2025 exports

Gas the plants took, 2025

1,423.1PJ

Bulletin board. Matches AEMO's LNG line

2028 cap against home use

271.9PJ

Home and business use plus 10% is larger, so the cap binds

Where the 2025 gas went, plant by plant

0 141 283 424 566 566 APLNG 495 QCLNG 362 GLNG

Exact values, feed gas in 2025. APLNG 565.7 PJ. QCLNG 495.0 PJ. GLNG 362.5 PJ. Published plant sizes: APLNG 9.5 Mt a year, QCLNG 8.5, GLNG 7.8.

0 360 719 1,079 1,439 1377 Cargo 24 1439 Taken 24 1336 Cargo 25 1423 Taken 25

Exact values. 2024 cargoes 1,376.7 PJ, feed gas 1,439.0 PJ. 2025 cargoes 1,336.0 PJ, feed gas 1,423.1 PJ. 2026 cargoes so far 990.9 PJ through 30 September 2026. 2026 feed gas so far 1,269.2 PJ over 322 days.

APLNGQCLNGGLNG

What this means

A fifth of 2025 cargoes is 267.2 PJ. The southern annual gap in the middle outlook is 1.3 PJ in 2029 and 12.2 PJ in 2030. Using that year's own LNG outlook, the fifth left over after the annual gap is 281.6 PJ in 2029 and 256.5 PJ in 2030. In 2028, home and business use plus 10% is 412.3 PJ and a fifth of outlook LNG is 271.9 PJ, so the obligation is the cap. The annual gap that year is zero. The reserved gas is much larger than the annual gap and smaller than a full year of home and business use.