East-coast gas

2029 peak day, full outlook

135TJ short

21 June 2029, after local gas, the pipe and storage

A fifth of a 2025 export day

780TJ

Average gas the three plants took, times one fifth

Left over that day, on paper

644TJ

Only if that gas can reach the southern cities

Southbound pipe, published limit

512TJ/day

Wallumbilla to Moomba. Already counted in the outlook

On the busiest day, how much is still missing?

-351 -199 -47 105 257 −322 2024 −351 2025 −151 2026 −161 2027 −198 2028 +135 2029 +257 2030

Exact values. 2024 actual 13 June 2024: demand 2,205.8 TJ, gap −322 TJ. 2025 actual 18 June 2025: demand 2,187.8 TJ, gap −351 TJ. 2026 outlook 18 June 2026: demand 2,300.3 TJ, gap −151 TJ. 2027 outlook 18 June 2027: demand 2,244.0 TJ, gap −161 TJ. 2028 outlook 22 June 2028: demand 2,138.7 TJ, gap −198 TJ. 2029 outlook 21 June 2029: demand 2,171.2 TJ, gap +135 TJ. 2030 outlook 19 June 2030: demand 2,182.5 TJ, gap +257 TJ.

0 304 608 913 1,217 +455 2024 +486 2025 +757 2026 +800 2027 +769 2028 +1,098 2029 +1,217 2030

Exact values. 2024 actual 13 June 2024: demand 2,205.8 TJ, gap +455 TJ. 2025 actual 18 June 2025: demand 2,187.8 TJ, gap +486 TJ. 2026 outlook 18 June 2026: demand 2,300.3 TJ, gap +757 TJ. 2027 outlook 18 June 2027: demand 2,244.0 TJ, gap +800 TJ. 2028 outlook 22 June 2028: demand 2,138.7 TJ, gap +769 TJ. 2029 outlook 21 June 2029: demand 2,171.2 TJ, gap +1,098 TJ. 2030 outlook 19 June 2030: demand 2,182.5 TJ, gap +1,217 TJ.

0 436 871 1,307 1,743 +905 2024 +954 2025 +1,225 2026 +1,268 2027 +1,295 2028 +1,624 2029 +1,743 2030

Exact values. 2024 actual 13 June 2024: demand 2,205.8 TJ, gap +905 TJ. 2025 actual 18 June 2025: demand 2,187.8 TJ, gap +954 TJ. 2026 outlook 18 June 2026: demand 2,300.3 TJ, gap +1,225 TJ. 2027 outlook 18 June 2027: demand 2,244.0 TJ, gap +1,268 TJ. 2028 outlook 22 June 2028: demand 2,138.7 TJ, gap +1,295 TJ. 2029 outlook 21 June 2029: demand 2,171.2 TJ, gap +1,624 TJ. 2030 outlook 19 June 2030: demand 2,182.5 TJ, gap +1,743 TJ.

ShortSpare

Across a whole year, a fifth of exports dwarfs the annual gap

0 71 141 212 283 274 2026 272 2027 272 2028 283 2029 269 2030 264 2031 267 2032
One fifth of that year's outlook LNG

Exact values. 2026: reserve 274.3 PJ, annual gap 0.0 PJ, left over 274.3 PJ. 2027: reserve 272.2 PJ, annual gap 0.0 PJ, left over 272.2 PJ. 2028: reserve 271.9 PJ, annual gap 0.0 PJ, left over 271.9 PJ. 2029: reserve 282.9 PJ, annual gap 1.3 PJ, left over 281.6 PJ. 2030: reserve 268.7 PJ, annual gap 12.2 PJ, left over 256.5 PJ. 2031: reserve 264.3 PJ, annual gap 28.2 PJ, left over 236.1 PJ. 2032: reserve 266.7 PJ, annual gap 11.4 PJ, left over 255.3 PJ.

What this means

In 2029 the outlook's busiest day is 135 TJ short even after local gas, the north-south pipe and storage. A fifth of an average 2025 day at the export plants is 780 TJ, so the volume is larger than that hole, with 644 TJ left over on paper. Without storage the same day is 1,098 TJ short, and 780 TJ does not cover it (318 TJ still missing). The published southbound pipe is 512 TJ a day and the outlook already uses it. Gas held back at Gladstone is not in Melbourne the same day. By 2030 the full-outlook hole is 257 TJ, still under a fifth of one 2025 day, with 523 TJ left over on paper.